SWITCHGEAR – UV88135MSG

PRECAST CONCRETE FOUNDATION FOR PADMOUNT SWITCHGEAR TYPICAL USE: THREE PHASE ENERSOURCE 10-104A (UP TO 28kV)

CONSTRUCTION SPECIFICATIONS
Concrete Properties: 4500 PSI (32 MPa) Min Strength
6-8% Air Entrainment

64 Cable entry openings – PVC seals for max 4"I.D. duct
Reinforcing – Steel to CSA CAN A23.1
Weight – 21,000 lbs / 9,550kg (Approximate)
Interface between halves sealed with butyl rubber
Top cable openingand side cable entry holes to have
smooth finished edges and surfaces

Notes:

  1. Four (4) 1″ Grounding holes
  2. (12) – 4 ton Swiftlift anchors (4 on inside walls of bottom half)
  3. 4″ Cylindrical straight drain
  4. 28″x44″ Lockable galv access frame and cover as per EHM standard 10-102C
  5. Four (4) Pulling eyes (2 per short wall in top)
  6. 1″ dia rebar tie in holes

WE SPECIALIZE IN CUSTOM DESIGNS

TO FIT OUR CLIENTS NEEDS.

We have experience staff that can find the best designs for your custom application.
Drawings are often available within 48 hours of design requirements.